Lesson 11
Polyhedra and Nets
Let's use nets to find the surface area of polyhedra.
Problem 1
Here are two three-dimensional figures.
Tell whether each of the following statements describes Figure A, Figure B, both, or neither.

- This figure is a polyhedron.
- This figure has triangular faces.
- There are more vertices than edges in this figure.
- This figure has rectangular faces.
- This figure is a pyramid.
- There is exactly one face that can be the base for this figure.
- The base of this figure is a triangle.
- This figure has two identical and parallel faces that can be the base.
Problem 2
-
Is this polyhedron a prism, a pyramid, or neither? Explain how you know.

- How many faces, edges, and vertices does it have?
Problem 3
-
What polyhedron can be assembled from this net? Explain how you know.

- Find the surface area of this polyhedron. Show your reasoning.
Problem 4
-
A parallelogram has a base of 12 meters and a height of 1.5 meters. What is its area?
- A triangle has a base of 16 inches and a height of \(\frac18\) inches. What is its area?
- A parallelogram has an area of 28 square feet and a height of 4 feet. What is its base?
- A triangle has an area of 32 square millimeters and a base of 8 millimeters. What is its height?
Problem 5
Find the area of the shaded region. Show or explain your reasoning.
